Kathmandu. As part of the road resumption from the Krishna Bhir landslide, around 20 vehicles, including a bullet vehicle, have been passed on the Kathmandu-Chitwan side as a test.
According to the Ministry of Infrastructure and Transport, a heavy vehicle has also been successfully passed on the Chitwan-Kathmandu route.
Work to bring the road into full operation is going on at a rapid pace.


प्रतिक्रिया दिनुहोस्