Skip to content

20 vehicles passed for road resumption after floods and landslides

nmb bank inside

Kathmandu. As part of the road resumption from the Krishna Bhir landslide, around 20 vehicles, including a bullet vehicle, have been passed on the Kathmandu-Chitwan side as a test.

According to the Ministry of Infrastructure and Transport, a heavy vehicle has also been successfully passed on the Chitwan-Kathmandu route.

Work to bring the road into full operation is going on at a rapid pace.

dish home inside

Arrow प्रतिक्रिया दिनुहोस्