{"id":115150,"date":"2026-10-13T14:24:44","date_gmt":"2026-10-13T08:39:44","guid":{"rendered":"https:\/\/arthakhabar.com\/?p=115150"},"modified":"2026-10-13T15:22:47","modified_gmt":"2026-10-13T09:37:47","slug":"national-transmission-line-reaches-hatiya-of-sankhuwasabha-2","status":"publish","type":"post","link":"https:\/\/arthakhabar.com\/en\/2026\/10\/13\/115150\/","title":{"rendered":"National Transmission Line reaches Hatiya of Sankhuwasabha"},"content":{"rendered":"<p><p> <strong> Electricity from the national transmission line reached Hatiya of Sankhuwasabha <\/strong><\/p>\n<p> Kathmandu. The Nepal Electricity Authority (NEA) has started supplying electricity from the national transmission line to Bhotkhola Rural Municipality-3, Hatiya in the northern part of Sankhuwasabha. The national transmission system has been expanded in the area which was previously consuming electricity from micro hydropower projects. <\/p>\n<p> The project operated by the Department of Planning and Technical Services under the NEA&#8217;s Directorate of Distribution and Customer Service has started supplying electricity by expanding the national transmission line in Hatiya. After the start of electricity supply from the national transmission line, the local residents, government offices, health institutions, grinding mills and cottage industries will be able to benefit. This is expected to increase the regularity and reliability of electricity supply in the local areas. According to Ram Babu Chaudhary, chief of Khandbari distribution center, the office of Bhotkhola Rural Municipality and Hospital in Hatiya have been installed and the supply of electricity has started. The NEA has also started the process of extending the national transmission line up to Kimathanka of Bhotkhola Rural Municipality, which is bordering China. The NEA has already started the tender process to supply electricity to the area. The target is to start the supply of electricity from the national transmission line in Kimathanka within the current fiscal year. About <\/p>\n<p>95 percent of the households in Sankhuwasabha are consuming electricity from the national transmission line. The remaining households are getting electricity through micro hydropower and solar energy. <\/p>\n<p>The NEA has been continuing the expansion of the national transmission system in the remote and geographically remote settlements of the district. The expansion of the national transmission line is expected to help in the operation of health and education services at the local level, development of cottage industries and expansion of economic activities. <\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Electricity from the national transmission line reached Hatiya of Sankhuwasabha Kathmandu. The Nepal Electricity Authority (NEA) has started supplying electricity from the national transmission line to Bhotkhola Rural Municipality-3, Hatiya in the northern part of Sankhuwasabha. The national transmission system has been expanded in the area which was previously consuming electricity from micro hydropower projects.<a href=\"https:\/\/arthakhabar.com\/en\/2026\/10\/13\/115150\/\">Continue reading <span class=\"sr-only\">&#8220;National Transmission Line reaches Hatiya of Sankhuwasabha&#8221;<\/span><\/a><\/p>\n","protected":false},"author":0,"featured_media":115147,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[147],"tags":[],"class_list":["post-115150","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-samachar-en"],"acf":[],"jetpack_featured_media_url":"https:\/\/arthakhabar.com\/wp-content\/uploads\/2026\/10\/bhotkhola-1_57fcec8a.jpeg","_links":{"self":[{"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/posts\/115150","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/comments?post=115150"}],"version-history":[{"count":1,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/posts\/115150\/revisions"}],"predecessor-version":[{"id":115151,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/posts\/115150\/revisions\/115151"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/media\/115147"}],"wp:attachment":[{"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/media?parent=115150"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/categories?post=115150"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/tags?post=115150"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}