{"id":78539,"date":"2026-07-22T12:25:00","date_gmt":"2026-07-22T06:40:00","guid":{"rendered":"https:\/\/arthakhabar.com\/?p=78539"},"modified":"2026-07-22T13:22:58","modified_gmt":"2026-07-22T07:37:58","slug":"sipring-khola-hydropower-project-halts-production-2","status":"publish","type":"post","link":"https:\/\/arthakhabar.com\/en\/2026\/07\/22\/78539\/","title":{"rendered":"Sipring Khola Hydropower Project halts production"},"content":{"rendered":"<p><p>. The production of electricity from the 10 MW Sipring Khola Hydropower Project promoted by Synergy Power Development Limited has been completely halted. The production was halted after the flood and landslide that occurred at 11:00 pm on July 21 damaged the project structure. <\/p>\n<p> According to the information provided by the company to Nepal Stock Exchange (NEPSE), floods and landslides have caused major damage to most of the structures of the project&#8217;s headworks.<\/p>\n<p>According to the preliminary information, the power generation has been halted for the time being as the physical infrastructure of the project has been damaged. <\/p>\n<p> Surendra Bahadur Khadka, managing director of the company, has informed the regulatory agencies about the adverse situation.<\/p>\n<p>The company has also sent information to the Securities Board of Nepal, Electricity Regulatory Commission, Office of Company Registrar and CDS and Clearing Limited about the incident. <\/p>\n<p> Further study is underway on the details of the damage and the time it will take for resumption of the project, which is located in Dokhla district.<\/p>\n<p>The closure of the project due to natural disasters will have a direct impact on the daily production and income of the company. <\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>. The production of electricity from the 10 MW Sipring Khola Hydropower Project promoted by Synergy Power Development Limited has been completely halted. The production was halted after the flood and landslide that occurred at 11:00 pm on July 21 damaged the project structure. According to the information provided by the company to Nepal Stock<a href=\"https:\/\/arthakhabar.com\/en\/2026\/07\/22\/78539\/\">Continue reading <span class=\"sr-only\">&#8220;Sipring Khola Hydropower Project halts production&#8221;<\/span><\/a><\/p>\n","protected":false},"author":0,"featured_media":78532,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[147],"tags":[],"class_list":["post-78539","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-samachar-en"],"acf":[],"jetpack_featured_media_url":"https:\/\/arthakhabar.com\/wp-content\/uploads\/2026\/07\/photo_bf3fe80f_8f2042ae.png","_links":{"self":[{"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/posts\/78539","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/comments?post=78539"}],"version-history":[{"count":1,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/posts\/78539\/revisions"}],"predecessor-version":[{"id":78540,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/posts\/78539\/revisions\/78540"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/media\/78532"}],"wp:attachment":[{"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/media?parent=78539"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/categories?post=78539"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/tags?post=78539"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}