{"id":80236,"date":"2026-07-27T08:56:00","date_gmt":"2026-07-27T03:11:00","guid":{"rendered":"https:\/\/arthakhabar.com\/?p=80236"},"modified":"2026-07-27T09:24:26","modified_gmt":"2026-07-27T03:39:26","slug":"import-of-electricity-from-india-zero-domestic-production-to-meet-demand-2","status":"publish","type":"post","link":"https:\/\/arthakhabar.com\/en\/2026\/07\/27\/80236\/","title":{"rendered":"Import of electricity from India zero, domestic production to meet demand"},"content":{"rendered":"<p><p>. The country&#8217;s electricity system has been exporting surplus energy to India to meet the demand from domestic production. According to Nepal Electricity Authority (NEA), the peak demand in the evening (peak hour) has reached 3,248 MW and the total daily demand is 73,629 MWh of energy. <\/p>\n<p> According to NEA, Nepal Electricity Authority (NEA) has not had to import any electricity from India during this period and has been exporting electricity worth 22,102 MWh of electricity.<\/p>\n<p>The private sector is the largest contributor to electricity generation. <\/p>\n<p> Private power producers are supplying 47,<\/p>\n<p>563 MWh of energy to NEA&#8217;s electricity system. NEA has been generating 8,959 MW hours of electricity from its own projects while 17,108 MW hours through its subsidiary companies. <\/p>\n<p> Meanwhile, power supply has not been disrupted in any part of the country due to rainfall since the onset of monsoon, NEA said.<\/p>\n<p>According to NEA, technical repair teams have been kept on standby round the clock at the offices in all seven provinces and in Kathmandu to resolve possible disruptions. <\/p>\n<p> These statistics indicate that Nepal is becoming self-reliant in the electricity sector in recent years due to the expansion of generation capacity, increasing participation of the private sector and improvement in the transmission system.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>. The country&#8217;s electricity system has been exporting surplus energy to India to meet the demand from domestic production. According to Nepal Electricity Authority (NEA), the peak demand in the evening (peak hour) has reached 3,248 MW and the total daily demand is 73,629 MWh of energy. According to NEA, Nepal Electricity Authority (NEA) has<a href=\"https:\/\/arthakhabar.com\/en\/2026\/07\/27\/80236\/\">Continue reading <span class=\"sr-only\">&#8220;Import of electricity from India zero, domestic production to meet demand&#8221;<\/span><\/a><\/p>\n","protected":false},"author":0,"featured_media":80216,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[147],"tags":[],"class_list":["post-80236","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-samachar-en"],"acf":[],"jetpack_featured_media_url":"https:\/\/arthakhabar.com\/wp-content\/uploads\/2026\/07\/d858fadc-a4a5-4092-a23e-2b265117c64e_c7f84da3.png","_links":{"self":[{"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/posts\/80236","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/comments?post=80236"}],"version-history":[{"count":1,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/posts\/80236\/revisions"}],"predecessor-version":[{"id":80237,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/posts\/80236\/revisions\/80237"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/media\/80216"}],"wp:attachment":[{"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/media?parent=80236"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/categories?post=80236"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/tags?post=80236"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}