{"id":84274,"date":"2026-08-05T15:10:00","date_gmt":"2026-08-05T09:25:00","guid":{"rendered":"https:\/\/arthakhabar.com\/?p=84274"},"modified":"2026-08-05T16:23:24","modified_gmt":"2026-08-05T10:38:24","slug":"gamgadhi-nakcha-road-obstructed-for-18-months-resumes-2","status":"publish","type":"post","link":"https:\/\/arthakhabar.com\/en\/2026\/08\/05\/84274\/","title":{"rendered":"Gamgadhi-Nakcha road obstructed for 18 months resumes"},"content":{"rendered":"<p><p>Dan Bahadur Budha, Nepal News Bank<\/p>\n<p>Mugu. The Alka Sangu motorable bridge area under the Gamgadhi-Nakchya road section has been reopened after 18 months at the initiative of Chhayanath Rara Municipality. <\/p>\n<p> The road section located in Chhayanath Rara Municipality-1 has been obstructed for long due to a dispute over compensation.<\/p>\n<p>Locals had blocked the road after the dispute over compensation for the land required for the operation of the 40-meter-long and 11-meter wide bridge constructed by the Road Division Office, Jumla, could not be resolved. <\/p>\n<p> Landowner Dhan Bahadur Malla and Chhayanath Rara Municipality have reached an agreement on compensation following the initiative led by Mayor Bishnu Kumar Bham.<\/p>\n<p>With the agreement, the obstruction on the road has been removed. <\/p>\n<p> According to the municipality, vehicular operation along the road section has been resumed from August 2, 2083 after the agreement was reached.<\/p>\n<p>It is expected to ease the movement of the locals and passengers along the Gamgadhi-Nakcha area after the road comes into operation. <\/p>\n<p> Although the bridge was constructed for a long time, the road could not come into use due to the dispute over land compensation.<\/p>\n<p>Now that the dispute has been resolved, both the bridge and the road are fully operational \u0964 <\/p>\n<\/p>\n<p><p><img decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/arthakhabar. com\/wp-content\/uploads\/2026\/08\/photo-1_fc58c0e6-1024x768. jpeg\" class=\"aligncenter size-large\" alt=\"\" loading=\"lazy\" \/><\/p>\n<p><img decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/arthakhabar. com\/wp-content\/uploads\/2026\/08\/photo-9_ccd2509f-1024x768. jpeg\" class=\"aligncenter size-large\" alt=\"\" loading=\"lazy\" \/><\/p>\n<p><img decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/arthakhabar. com\/wp-content\/uploads\/2026\/08\/photo-8_a5faa624-1024x768. jpeg\" class=\"aligncenter size-large\" alt=\"\" loading=\"lazy\" \/><\/p>\n<p><img decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/arthakhabar. com\/wp-content\/uploads\/2026\/08\/photo-7_5cedc16a-1024x768. jpeg\" class=\"aligncenter size-large\" alt=\"\" loading=\"lazy\" \/><\/p>\n<p><img decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/arthakhabar. com\/wp-content\/uploads\/2026\/08\/photo-6_e7a7b54e-1024x768. jpeg\" class=\"aligncenter size-large\" alt=\"\" loading=\"lazy\" \/><\/p>\n<p><img decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/arthakhabar. com\/wp-content\/uploads\/2026\/08\/photo-5_1f4e9f21-1024x768. jpeg\" class=\"aligncenter size-large\" alt=\"\" loading=\"lazy\" \/><\/p>\n<p><img decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/arthakhabar. com\/wp-content\/uploads\/2026\/08\/photo-4_fb2dad98-1024x768. jpeg\" class=\"aligncenter size-large\" alt=\"\" loading=\"lazy\" \/><\/p>\n<p><img decoding=\"async\" width=\"960\" height=\"720\" src=\"https:\/\/arthakhabar. com\/wp-content\/uploads\/2026\/08\/photo-3_de421086. jpeg\" class=\"aligncenter size-large\" alt=\"\" loading=\"lazy\" \/><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dan Bahadur Budha, Nepal News Bank Mugu. The Alka Sangu motorable bridge area under the Gamgadhi-Nakchya road section has been reopened after 18 months at the initiative of Chhayanath Rara Municipality. The road section located in Chhayanath Rara Municipality-1 has been obstructed for long due to a dispute over compensation. Locals had blocked the road<a href=\"https:\/\/arthakhabar.com\/en\/2026\/08\/05\/84274\/\">Continue reading <span class=\"sr-only\">&#8220;Gamgadhi-Nakcha road obstructed for 18 months resumes&#8221;<\/span><\/a><\/p>\n","protected":false},"author":0,"featured_media":84239,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[147],"tags":[],"class_list":["post-84274","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-samachar-en"],"acf":[],"jetpack_featured_media_url":"https:\/\/arthakhabar.com\/wp-content\/uploads\/2026\/08\/photo-2_892806ae.jpeg","_links":{"self":[{"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/posts\/84274","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/comments?post=84274"}],"version-history":[{"count":1,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/posts\/84274\/revisions"}],"predecessor-version":[{"id":84275,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/posts\/84274\/revisions\/84275"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/media\/84239"}],"wp:attachment":[{"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/media?parent=84274"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/categories?post=84274"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arthakhabar.com\/ak_api\/wp\/v2\/tags?post=84274"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}