Skip to content

New wooden bridge in Syaphrubesi comes into operation

nmb bank inside

Traffic in the area has been reopened after the flood in the Bhotekoshi River swept away the bridge at Syaphrubesi of Rasuwa district.

Locals had constructed a wooden bridge for traffic management after the floods on August 2

6, but the floods on November 28 swept away the wooden bridge, said Phurpu Tamang, a local social worker.

According to Tamang, a new bridge was constructed at the local level after the wooden bridge was swept away and it came into operation from Monday.

dish home inside

Arrow प्रतिक्रिया दिनुहोस्